No experience
Employment Type:
Full time
Job Category:
OSP Access Site Engineer
(This job is no longer available)
iStaff | Durham, NC
Grad Date

Not sure what types of jobs you are interested in?

Explore Jobs
Based on Your Education

Follow This Company

Job Description

OSP Access Site Engineer

Client Location: 100% Remote

CTH: 6 months

Rate: Market rate based on experience and word examples

If you are looking for a great opportunity that is 100% remote work please contact me now. Hiring will be through February of 2018.

Required criteria:

  • Must have CTL experience in design and build of Remote sites with an emphasis on Copper
  • Must know CTL Systems- NDS is the most important. We can work around not knowing that but they are not as attractive to the client
  • Must be able to show examples of work

Job Description:

In coordination with the Project Implementation Plan, a Site Surveys to be performed to determine the physical status of the site itself to include a determination of suitability for the installation of the Network Element (NE), required power, cable and conduit placement recommendation, hand-hole locations, stake, pole or H-frame requirements and pedestal placement.

Deliverables include:

  • Complete Site Survey Form template
  • Analyze the site conditions and recommended NE and placement
  • An itemized work task summary for site preparation and NE installation
  • Identify installation issues (ie material delivery issues, gate codes, access restrictions, etc.)
  • Digital photographs of work location (as able)
  • Marked drawings associated with the scope of work will include: Floor, High Cable, Low Cable, Grounding, Power Attributes, DFE, AC, Fiber and Front Equipment
  • Revise redlines to existing CenturyLink drawings as required
  • (New Sites so unlikely)
  • Engineering includes normal permitting (Town, City, County, State)
  • (Carrier handles this part historically)
  • Site Survey includes Telco Co. Meeting and Power Co. Meeting.
  • 911 Address Application as required.
  • Power Company Service Application as required.
  • (Phoenix will Handle this as part of project management)

Unit of Measure - Per Site


  • OSP Systems Engineering
  • No Pole Permit or Wind Loading required (To be priced separately is necessary and agreed to before work commences.)
  • Complex permitting requirements involving Federal, Environmental, Railroad, etc. (To be priced separately and agreed to before work commences.)
  • Assume No Maintenance of Traffic (MOT) Required in Field (No Barricade Plans). (To be priced separately and agreed to before work begins.)


Applicants must be eligible to work in the specified location